Our Recent projects

Commercial

Palmerston Library

Installation of the City of Palmerston Library100kw solar system. This system had specific criteria that were to be met regarding fire system integration. Surge protection and rapid shut down features that stood this project out from many others. 

Commercial

Mother Teresa Catholic School

Engaged as the subcontracted solar installer for Delta Electrics to assist with the installation of a second commercial solar system onsite. 

Our team installed the 100KW

Commercial

Adina Vibe Hotel

Completed the installation of a 250kW system at the Adina Vibe Hotel located at the Darwin Waterfront. 

Commercial

Acacia 9.6KW Ground Mount

Designed and installed ofa 9.6kw ground mount at a property in Acacia. James has voltage issues at his property and is a renewable energy advocate.