CLIENT : City of Palmerston
YEAR : 2018
VALUE : $95K
SCOPE OF WORKS
Installation of the City of Palmerston Library100kw solar system. This system had specific criteria that were to be met regarding fire system integration. Surge protection and rapid shut down features that stood this project out from many others.
The system had power factor corrected and grid protection relays installed to protect the integrity of the network. This was the first time in the NT that a system of this calibre has been installed and NC Electrical can safely say we excelled is all aspects of the delivery. Zero safety issues and completed on time and to budget.